A condo renovation that finishes when we said it would.

For owners of condos and serviced residences between 700 and 2,400 sqft. We handle the JMB submission, the lift booking, the security pass list, and the wet works approval. You don't see any of it.

SERVICE FACT SHEET
UNIT SIZE
700 – 2,400 sqft
TYP. RANGE
RM 120k – 220k
TYP. BUILD
10 – 14 weeks
WARRANTY
24 months
DELIVERED
47 condos · 2023–25
Completed full condo renovation — Mont Kiara, Verve Suites, 1,420 sqft
HC-024 · MONT KIARA · 1,420 SQFT · COMPLETED 03/2025
— Sect. 01 / Promise SECT-01 / 09

Three things we sign before demolition starts.

The same contractual specs as the homepage, written specifically for condo work — where the harder problems are coordination, not craft.

01

Fixed-price quote within 7 days

From the site visit, not from a brief.

We measure your unit on site, photograph every elevation, and return a fixed-price contract within five to seven working days. The condo-specific cost lines — JMB application, lift booking, security deposits — are itemised, not absorbed into a vague allowance.

TURNAROUND / 5–7 WORKING DAYS
02

Daily photo updates from inside the unit

Five to twelve photos per working day, by 7pm.

You will not need to drive across town to know what was done today. A named project manager is in your unit five days a week and posts the day's work to a private portal. Useful when you live out of town, abroad, or simply at the office.

PORTAL / PRIVATE PROJECT URL
03

24-month warranty on everything we install

Tile, joinery, plumbing, electrical, waterproofing.

Condo work is harder to warrant: humid risers, shared walls, building movement. We warrant it anyway. Defects rectified within five working days of report — and yes, that includes a tile that lifts in month 22.

CLAUSE 9.1 / 24 MONTHS
— Sect. 02 / Scope SECT-02 / 09

What's in the contract. What isn't.

The single largest source of renovation arguments is undefined scope. Below is what we sign — to the comma. If something matters to you that isn't listed, ask before signing, not after.

INCLUDED IN THE CONTRACT SUM
  • Demolition, hacking permit liaison, and debris removal via the service lift
  • Plumbing rough-in, repipe, and wet works approval submission to the JMB
  • Electrical rewire to current MS IEC 60364 standards; consumer unit upgrade if required
  • Air-conditioning relocation, condensate trunking, and gas charge
  • All carpentry and joinery — kitchen, wardrobes, TV console, study desks, vanities
  • Tiling, flooring, ceiling works, plastering, full paintwork (one coat undercoat, two coats finish)
  • Sanitary ware and tapware installation (owner-specified or specified by us)
  • Project management, daily photo log, site supervision five days a week
  • JMB renovation application, permit fees, security deposit liaison
  • Final cleaning, defects walkthrough, snagging within 14 days of handover
EXCLUDED · QUOTED SEPARATELY OR YOUR RESPONSIBILITY
  • Furniture, soft furnishings, rugs, lighting fixtures (we will supply on request, separately quoted)
  • Owner-supplied materials are installed but excluded from the workmanship warranty
  • Structural changes requiring engineering approval (we will help you brief a P.E.)
  • JMB sinking-fund payments or maintenance arrears (your obligation, not ours)
  • Window film, tinting, and curtain installation (we can recommend specialists)
  • Smart-home wiring beyond standard cat-6 (quoted separately on request)
  • Aircon supply and warranty (we install; the unit warranty stays with the brand)
  • Storage of personal items during the build (we recommend a third-party storage facility)
— Sect. 03 / Pricing SECT-03 / 09

Most condo renovations we deliver fall between RM 120,000 and RM 220,000.

RM 120,000
ESSENTIAL START
RM 220,000
ELEVATED CEILING

Based on 47 full-condo contracts, 2023–2025. Typical 3-bedroom condo, 900–1,400 sqft.

COST ALLOCATION / MID-POINT RM 168,000
6% Demo + disposal
RM 10k
18% M&E
RM 30k
38% Carpentry + joinery
RM 64k
22% Finishes
RM 37k
8% PM + permits
RM 13k
8% Contingency
RM 13k
Use the full calculator to get your specific number
— Sect. 04 / Timeline SECT-04 / 09

Twelve weeks, mapped to the day.

Below is the typical week-by-week sequence for a full condo renovation. Scope and building complexity can extend this; we do not compress it.

01
Wk 1–2
Design lock

Final drawings signed off; material library closed; contract counter-signed. No site work.

02
Wk 3
Permits + demolition

JMB renovation permit issued. Demolition completes in 4–6 working days. Lift bookings live.

03
Wk 4–6
M&E rough-in

Plumbing, electrical, aircon. All wet works approved before tile underlay is laid. Lines tested twice.

04
Wk 7–9
Carpentry + tiling

Cabinetry installed off measured drawings, not site measurements. Tile laid concurrently in dry zones.

05
Wk 10–11
Finishes

Paint, flooring, ceiling. Sanitary ware fitted. Aircon charged and commissioned. Touch-ups daily.

06
Wk 12
Handover + snagging

Joint walkthrough, written defects list, rectification before final payment. Keys returned, portal archived.

— Sect. 05 / Work SECT-05 / 09

Three condo projects, fully documented.

Below is a representative selection from the forty-seven full-condo contracts completed since 2023.

Mont Kiara Condo — 1,420 sqft
HC-024 · 2025 Elevated

Mont Kiara Condo

Mont Kiara · Verve Suites · 1,420 sqft

Reworked the kitchen and living spine for a family of four. Removed a load-bearing wall; rebuilt with a steel header. Oak veneer cabinetry, honed limestone island, brass hardware.

BUDGET
RM 285k
DURATION
14 weeks
TTDI Two-Bedroom — 950 sqft
HC-017 · 2024 Essential

TTDI Two-Bedroom

TTDI · Sri Penaga · 950 sqft

First-home renovation on a budget. Kept the original parquet, refinished. New wet areas, full M&E rewire, custom wardrobe to the smaller bedroom. Within the cap to the ringgit.

BUDGET
RM 142k
DURATION
11 weeks
Mont Kiara Three-Bedroom — 1,650 sqft
HC-012 · 2023 Luxury

Mont Kiara Three-Bedroom

Mont Kiara · Arcoris · 1,650 sqft

Full reconfiguration for a returning expatriate family. Three bedrooms reduced to two, dressing room added between the master and the en-suite, walnut and brass throughout.

BUDGET
RM 298k
DURATION
17 weeks
— Sect. 06 / Knowledge SECT-06 / 09

The questions specific to condo work.

What you don't know about your building's rules is what delays a renovation. Below are the five questions we answer on every condo site visit.

We submit the application on your behalf within 48 hours of contract signing. It bundles: floor plan, scope summary, contractor licence (our CIDB G5), public liability cert (Allianz, RM 5m), and the building's standard renovation deposit. Most JMBs return approval within 5–10 working days; we have a working relationship with the buildings we operate in regularly (Mont Kiara, Bangsar, KLCC) which shortens this further.

Wet works = any tiling, waterproofing, or plumbing relocation that adds load or risks leakage into the unit below. Most buildings allow them only in original wet zones (kitchen, bathrooms, yard) and require a waterproofing membrane test before tile underlay. We do this test twice — once before tiling, once after — and a copy of the certificate goes to the JMB and into your handover folder.

Possibly. About 70% of internal condo walls are non-structural and can be removed with JMB approval. Structural walls (usually those along the unit's perimeter or around the column line) cannot be removed without a P.E. report and developer sign-off; in our experience the developer route is rarely worth pursuing on a strata-titled condo. We confirm which walls are which during the site visit, before quoting.

KL condo noise hours are typically 09:00–17:00 weekdays, 10:00–17:00 Saturdays, no Sundays or public holidays. Heavy demolition is usually restricted to 10:00–16:00 weekdays only. Our 12-week programme is built around these windows; we do not promise a 10-week build that depends on weekend hacking.

Your project manager books the service lift 48 hours in advance for any delivery over a single trolley. We use padded lift protection (supplied by us) and our own delivery crew — your security pass list is signed off on day one and updated through the portal. We do not lock the lift for your neighbours; we book it in 90-minute windows.

— Sect. 07 / Voices SECT-07 / 09

Two families, two different cities.

"We bought the unit furnished, top to bottom, by the previous owner — and hated all of it. Twelve weeks later we walked back into a home that was actually ours, on the exact day they said. The lift bookings, the JMB submissions — none of that ever became our problem."
Sarah Tan & Adrian Lee
Sarah Tan & Adrian Lee
Verve Suites · Mont Kiara · 1,420 sqft
"We live in Singapore and own the unit in KL. We were quoted four times by four different contractors and three of them needed us to fly up. Haven did the entire 11-week build with us on a daily WhatsApp and the 7pm photo log. We came up twice — once to sign, once to collect keys."
Priya & Daniel Wong
Priya & Daniel Wong
Sri Penaga · TTDI · 950 sqft
— Sect. 08 / Instrument SECT-08 / 09

Get a number for your specific condo.

Five questions. Two minutes. Pre-filled for a condo scope — adjust if you're doing partial work only.

— Sect. 02 / Instrument SECT-02 / 11

Instant estimate. Five questions. No call.

A pricing instrument built from 212 completed projects. It returns a range, an allocation breakdown, a duration, and a written scope-sheet.

METHOD / WEIGHTED AVERAGE OF EXECUTED CONTRACTS
SAMPLE / 212 PROJECTS, 2017–2025
MARGIN / ±9% VS. SIGNED CONTRACT
— Sect. 09 / Action SECT-09 / 09

Book a site visit. Decide afterwards.

An hour in your condo with a senior designer and our PM. We measure, we listen, we leave. No drawings, no quote, no follow-up until you want one.

VISIT
60–90 min
FEE
None
FOLLOW-UP
On your request
CONTACT / HAVEN & CO

INITIAL CONSULTATION — NO FEE · NO COMMITMENT · NO FOLLOW-UP SALES CALL UNLESS REQUESTED

+60 12 345 6789